Guide · Florida
As-Built Survey for Florida Retail Tenants: Know Your Space
Before you sign a lease or start a fit-out in Florida storefronts — from Brickell retail to strip centers in Orlando and lifestyle malls in Tampa, you need to know exactly what you are leasing. A retail as-built survey documents the real dimensions, columns, clear heights, and utility locations of the space — not the approximate numbers on a marketing plan — so you can design, bid, and build with confidence across Miami, Fort Lauderdale, West Palm Beach, Orlando, and Tampa.
Why Landlord Floor Plans Are Often Not Enough
Landlord plans are frequently outdated, schematic, or stated in rentable rather than usable square footage. That gap can hide columns, low soffits, missing utility stubs, or storefront constraints that change your build-out cost after the lease is signed. In Florida, where many retail spaces sit in older or repeatedly renovated buildings, the difference between the plan and the reality can be costly.
What an As-Built Survey Tells You Before You Fit Out
A measured survey replaces assumptions with facts:
- True usable square footage and overall dimensions
- Column grid and clear/ceiling heights
- Storefront openings and glazing
- Rear and service access
- Visible electrical, plumbing, HVAC, and fire-protection stubs
- Existing partitions and conditions to remove or keep
Who Needs a Retail As-Built Survey in Florida
Accurate existing conditions matter to everyone touching the space:
- Franchise tenants adapting a prototype to a real space
- Restaurateurs planning kitchens, hoods, and gas service
- Boutique and independent retailers designing a build-out
- Landlords preparing accurate leasing plans
- Architects and contractors pricing and filing the work
Florida Retail Build-Out Requirements
Build-out permits need existing-condition drawings anyway, so one survey serves both leasing and permitting. Florida requires a recorded Notice of Commencement before work begins, and coastal projects must satisfy wind-borne-debris and product-approval rules (Florida Product Approval or a Miami-Dade NOA for impact-rated assemblies). Many jurisdictions also offer a private provider option to speed plan review. Documenting the space accurately up front is what keeps your permit filing and your opening date on track.
Restaurants and Food Service
Restaurants are the most documentation-heavy retail use. Hood and grease-duct routes, gas service, floor drains, grease interceptors, and walk-in locations all matter, and both health-department and building permits depend on accurate existing plans. Getting these conditions documented before design prevents expensive surprises during construction.
Franchise Build-Outs
Franchise tenants work from a corporate prototype that must be adapted to a specific space. Exact dimensions, column locations, and utility positions are essential before the prototype can be fit to the site — and an accurate as-built survey is what makes that adaptation possible without costly redesigns.
What You Receive and How Long It Takes
You receive layered AutoCAD DWG files plus PDFs, drawn to scale and ready for your designer and contractor. Most retail surveys are delivered from 2 business days, depending on the size of the project from the site visit, with rush options when a lease or opening deadline is tight; see our process guide for details.
Frequently Asked Questions
Should I survey before or after signing the lease?
Ideally before — verified square footage and real constraints protect the deal. If you have already signed, order it before design begins.
Can you work around an existing tenant or business?
Yes. We schedule around operating hours when needed and work efficiently to minimize disruption.
Do you document the kitchen and MEP for restaurants?
We document all visible systems, including kitchen utilities and exhaust routing, which are critical for restaurant permitting.