As-Built Survey Process NYC: What to Expect From Measurement to Final Drawings
When your architect, contractor, or co-op board asks for as-built drawings before a renovation, DOB filing, or board approval, your first question is probably: what actually happens? How long does it take, and what do I get at the end? This guide walks you through the entire as-built survey process NYC — from the initial phone call to the final CAD and PDF deliverables your architect needs to get started.

What Is an As-Built Survey in NYC?
An as-built survey (also called an existing conditions survey or field measurement) is the process of physically measuring a property — room by room, wall by wall — and producing accurate, dimensioned floor plan drawings that reflect exactly how the space exists today. These drawings are the starting point for any architect, and a requirement for most NYC DOB permit filings. Unlike a standard appraisal or inspection, an as-built survey captures precise dimensions: room sizes, ceiling heights, window and door locations, wall thicknesses, column positions, and structural features. The result is a set of CAD drawings (.dwg) that your architect can build directly on top of without re-measuring the space themselves.
Step 1 — Scheduling the Field Measurement
The process begins with a simple consultation — by phone, email, or contact form. You describe the property: its borough, approximate square footage, number of floors or units, and what the drawings will be used for (DOB filing, renovation design, co-op board submission, etc.). The as-built survey process NYC typically begins from 2 business days, depending on the size of the project of your initial inquiry. For permit requirements, refer to the NYC Department of Buildings. From there, we confirm a price and timeline, and schedule a field visit. In most cases, we can schedule an on-site measurement usually within the same week. For time-sensitive projects with upcoming DOB filing deadlines, rush turnaround is available. Before the visit, ensure access to the property and any locked rooms, closets, or mechanical spaces that need to be captured.
Step 2 — The On-Site Field Measurement Visit
On the day of the survey, a field technician arrives at your property with professional-grade measuring equipment, including laser distance meters and measuring tapes. The visit takes about 30–60 minutes for a studio and longer for larger spaces depending on the size and complexity of the space. During the visit, the surveyor captures:
- All room dimensions, including length, width, and ceiling height
- Wall locations and thicknesses
- Window and door openings — size, position, and swing direction
- Columns, beams, and structural elements
- Mechanical room locations, utility risers, and chase locations
- Staircase dimensions and landings
- Any existing built-ins, wet walls, or fixed features relevant to the project



Step 3 — CAD Drafting and Drawing Production
After the field visit, our drafting team converts all measurements into a full set of CAD drawings using AutoCAD. This is where raw field notes and laser measurements become clean, dimensioned, professional floor plans. The drafting process typically takes from 2 business days, depending on the size of the project. The draftsperson lays out every wall, door, window, and structural element at precise scale, cross-checks dimensions for accuracy, and resolves any field measurement inconsistencies before delivery.



Step 4 — Review and Final Delivery
Once complete, we deliver the drawings digitally — by email or shared download link — in both CAD (.dwg) and PDF formats. Most clients receive their drawings from 2 business days, depending on the size of the project of the field visit. If your architect requests a minor revision, we address those promptly as part of the project.
What’s Included in the Final As-Built Drawing Package?
Additionally, a standard as-built drawing package includes:
- Dimensioned floor plans — All rooms drawn to scale with full dimensions labeled
- Ceiling heights — Noted on plan or in section as required
- Door and window locations — Sizes and positions clearly marked
- CAD file (.dwg) — AutoCAD format, ready for your architect to use immediately
- PDF export — Clean, print-ready PDF for submission or sharing with contractors
How Long Does the As-Built Survey Process NYC Take?
From first contact to final delivery, the typical as-built survey turnaround in NYC is from 2 business days:
- Day 1–2: Consultation, quote, and scheduling
- Day 2–4: On-site field measurement visit
- Day 3–5: CAD drafting and quality review
- Day 5: Delivery of CAD and PDF drawings
We offer rush delivery for time-sensitive projects. Large properties or multi-unit buildings may take longer — we confirm the timeline upfront before work begins.
How to Prepare Your Space for the As-Built Survey Process NYC
Minimal preparation is needed, but a few things help the process go smoothly:
- Ensure all rooms, closets, and storage areas are accessible on the day of the visit
- Clear any furniture or items blocking walls, windows, or doorways if possible
- Provide access to mechanical rooms, electrical panels, and any basement or roof areas to be included
- Let us know in advance about any areas that cannot be accessed so we can plan accordingly
Fortunately, you don’t need to prepare the walls or rearrange the space. The surveyor works around existing furniture and conditions — the goal is to document the space exactly as it exists today.