There is a persistent myth in Philadelphia real estate: that historic designation makes renovation impossible. It doesn’t. The Historical Commission approves the overwhelming majority of applications it reviews — what stalls projects is not the designation, it is the documentation. If your property is listed on the Philadelphia Register of Historic Places or contributes to a district like Society Hill, Old City or Rittenhouse-Fitler, an accurate as-built survey of your historic Philadelphia building is the foundation of a clean submission. Here are the six mistakes we see owners make, and how to avoid every one of them.

Mistake 1: Submitting Old Drawings as “Existing Conditions”
A 19th-century rowhouse has usually been altered a dozen times — kitchens moved, dormers added, rear ells extended. Presenting outdated plans as current conditions gets caught quickly, because commission staff know these blocks intimately. A fresh existing conditions survey measured on site is the only baseline that holds up.
Mistake 2: Ignoring the Facade Details That Matter Most
Review concentrates on character-defining features: cornices, brick bonds, marble steps, shutters, window muntin patterns. Drawings that reduce a Federal-era facade to four lines and a rectangle give reviewers nothing to approve. Our surveys locate and dimension these elements, and for ornate fronts we use 3D laser scanning to capture profiles exactly.
Mistake 3: Existing and Proposed Sheets That Don’t Match
When the “existing” elevation and the “proposed” elevation are drawn at different scales — or worse, from different assumptions — reviewers cannot tell what is actually changing. Both sets should grow from one measured DWG baseline. That is how we deliver: layered AutoCAD files your architect draws the proposal directly onto, as described in our Philadelphia rowhouse survey guide.
Mistake 4: Forgetting That L&I Comes Next
Historical Commission approval is a prerequisite, not a substitute, for the building permit. Licenses & Inspections will review its own drawing set, and inconsistencies between the two submissions restart clocks. One accurate survey should feed both — see our primer on Philadelphia L&I permit basics for how the tracks connect.
Mistake 5: Under-Documenting Interiors on Bigger Projects
The Commission’s jurisdiction is mostly exterior, but the moment your project adds units, changes egress or touches structure, L&I wants complete interior plans — wall thicknesses, stair geometry, ceiling heights. Rowhouse floor levels rarely align with what anyone assumes. Full-building as-builts cost little more while you already have surveyors on site, and they save a second mobilization later.
Mistake 6: Assuming This Only Applies to Center City
Historic review extends well beyond Society Hill — Germantown, Spruce Hill, and individually designated buildings citywide, plus borough-level historic districts on the Main Line and in Bucks County towns like Doylestown and New Hope, each with their own review boards. Wherever the property is, the sequence is the same: measure first, design second, submit once. Architects who work these districts routinely start with our existing-conditions packages for Philadelphia firms.
What a Historic Survey Package Includes
For a designated Philadelphia property, a complete as-built package typically contains dimensioned floor plans for every level including basements and cellars, a measured front elevation locating cornice, lintels, sills, steps and ironwork, a window and door schedule noting materials and configurations, and ceiling heights throughout. Where the project involves an addition, we add rear and side elevations plus roof outlines. Everything is drawn in layered AutoCAD DWG — walls, openings, annotations and dimensions on separate layers — with PDF sets formatted for the Historical Commission’s submission standards. The field visit itself takes a few hours for a typical rowhouse; occupied buildings are fine, and nothing about the measurement disturbs historic fabric.
One practical tip: commission review calendars and L&I processing both move on their own clocks, so owners who order the survey at the same time they engage an architect consistently reach permit weeks earlier than those who wait for a design concept first. The measurement is the one input every later step depends on.
Measure Once, Approve Once
One site visit, and your DWG and PDF drawings arrive usually within the same week — a baseline that carries your project from Historical Commission review through the L&I permit without contradictions. Want a number for your building? Call +1 929-767-4853 with the address, and you will have a free quote before the day is out.