As-Built Plans for NYC Co-op & Condo Alteration Agreements

Updated August 2026.

Before a NYC co-op or condo board will approve your renovation, it needs a complete set of architectural drawings from a registered architect. Before your architect can draw those, they need to know what is actually there — every wall position, ceiling height, riser and beam. That measured record is an as-built survey, and in most Manhattan buildings it does not exist yet.

We measured more than 300 NYC properties last year. Usable drawings from the building existed in roughly one case in ten. Even then, they rarely matched what we found on site.

What an alteration agreement actually requires

An alteration agreement is a binding contract between you and your building that governs what work is permitted, who may perform it, and under what conditions. Most NYC co-ops and condos require one before any renovation begins.

The submission package your board reviews typically includes:

  • Architectural drawings and specifications for the proposed work
  • A written scope of work
  • Product specifications for anything touching building systems
  • Contractor licensing and certificates of insurance
  • DOB filing documentation
  • Written responses to the reviewing architect’s comments

Notice what is not on that list: an as-built survey. Boards do not ask for one directly. They ask for the architectural drawings — and those cannot be produced accurately without one.

This is why our clients are usually architects, not owners. The architect is the one who discovers, at the start of a project, that there is nothing reliable to draw on top of.

The problem nobody mentions until it is expensive

Most NYC apartment buildings predate any requirement to keep accurate records. Original construction documents were lost, never digitized, or belong to a managing agent who cannot locate them. When drawings do surface, they show design intent from decades ago — not what contractors actually built, and not the renovations that happened since.

Across the 300+ properties we measured last year:

  • Building drawings were available in about 10% of projects
  • Where they existed, they almost always disagreed with our field measurements
  • The rest had no usable documentation at all

Designing from a drawing that is wrong costs more than designing from nothing, because nobody checks it until the cabinets do not fit.

What this looks like on a real project

An architect brought us a Manhattan apartment — five bedrooms, four terraces — and asked for existing conditions before starting their alteration package.

Floor plan supplied by the building for a Manhattan condo, showing room names but no working dimensions or ceiling heights
The plan the building provided. Clean, and largely decorative — no dimensions to design from, no ceiling heights, no structural conditions.
Measured as-built floor plan of a Manhattan apartment with room dimensions, window head and sill heights, and ceiling heights recorded room by room
What we measured. Every room dimensioned, window head and sill heights noted, ceiling heights recorded room by room.
Overlay comparing the building-supplied plan in red with the measured as-built survey in black, showing wall positions that do not match
The two drawings overlaid. Red is the building’s plan; black is the measured reality. The walls do not land in the same places.

Two things stand out.

Wall positions shift. Look at the bedrooms along the left side and the perimeter of the living room. The offsets are small individually — inches — but they accumulate across a plan, and they are the difference between a built-in that fits and one that gets rebuilt on site.

Ceiling heights are not in the building plan at all. We recorded 8’-0″ through most of the apartment, but 7’-3″ and 7’-2″ across parts of the living and dining rooms, and 6’-7″ in one bedroom area. Those are beams and bulkheads. They do not appear on the building’s drawing because that drawing was never meant to be built from. An architect designing tall cabinetry or a ceiling detail from that plan finds out during construction.

Co-op or condo — does it change anything?

Legally, yes. Practically, less than people expect.

In a co-op you own shares in a corporation and a proprietary lease, so the board has broad discretion over scope, contractors and scheduling. In a condo you hold title to real property, which usually means a lighter review.

But governance is building-specific rather than structural. Plenty of condos run reviews as demanding as any co-op, and some co-ops are straightforward. What does not change either way: your architect still has to produce accurate drawings, and those still start with an accurate measurement.

What we deliver

Always included: a dimensioned floor plan in AutoCAD DWG and PDF — every wall, door and window, ceiling heights and main plumbing fixtures — ready for your architect to design over, plus a PDF set for board submission.

Quoted on top, where the project needs them:

  • Reflected ceiling plans, with heights recorded room by room
  • Elevations and building sections
  • MEP and riser locations
  • 3D models in Revit

Turnaround starts at 2 business days from the site visit and depends on the size of the project. For an additional fee we can be on site within 24 hours and deliver drawings from 24 hours after the visit. We work across all five boroughs, and regularly with architecture firms who bring us in at the start of a project rather than after a surprise.

Related: as-built surveys for NYC architects and what determines as-built survey cost in NYC.

Starting an alteration package?

Send us the address and we will tell you what we can measure and when. Free quote in 2 hours.

Frequently Asked Questions

Does my co-op board require an as-built survey?

Usually not by name. Boards require architectural drawings of the proposed work from a registered architect. Those drawings have to be based on accurate existing conditions, which is where an as-built survey comes in. Some buildings do ask for existing-conditions drawings explicitly — check your alteration agreement.

My building said they have plans. Do I still need a survey?

Probably. In our experience about one project in ten has building drawings available, and those rarely match current conditions. Old plans show original design intent, not later renovations or what was actually built. Your architect can tell you quickly whether what you have is usable.

How long does an as-built survey take?

The site visit takes about 30–60 minutes for a studio and longer for larger spaces. Finished CAD drawings follow from 2 business days, depending on the size of the project.

Do you file with the DOB?

No. We produce the measured existing-conditions drawings your architect designs from. Your architect or engineer prepares and files the ALT-2 application — NYC requires a registered architect or professional engineer for that.

What is an ALT-2?

The DOB filing type for most interior apartment renovations — work that changes the layout but not the building’s legal use or occupancy, so the Certificate of Occupancy stays as is. Moving a kitchen, reconfiguring bathrooms, removing non-structural walls.

Can you work from the architect’s side?

That is most of our work. Architecture firms bring us in at the start so they have reliable dimensions before design begins.