Guide · Florida
As-Built Drawings for a Florida Certificate of Completion: Closing the Gap Between Permit and Reality
Florida has a quiet rule that decides a lot of remodels. A renovation closes on a Certificate of Completion rather than a Certificate of Occupancy as long as it does not change the existing floor plan. So the moment a crew moves a wall, that basis stops being true. If you need as-built drawings in Florida before a final inspection, this is usually why.

The Code Names the Deliverable for As-Built Drawings in Florida
Florida is the most explicit of any market we work in. Florida Building Code Section 107.4 states:
Any changes during the construction that are not in accordance with the approved construction documents shall be resubmitted for approval as an amended set of construction documents.
Not “may be”, and certainly not “worth a chat with the inspector”. The code names the product: an amended set of construction documents. Producing that set is the job, and it starts with measuring what is actually there.
Certificate of Occupancy or Certificate of Completion?
In addition, Florida Building Code Section 111 covers both, and the split matters more here than in most states.
| What you built | What closes it |
|---|---|
| New construction, additions, change of use or occupancy | Certificate of Occupancy |
| Remodel or alteration that does not change the existing floor plan | Certificate of Completion |
| Shell buildings and shell spaces | Certificate of Completion |
Temporary versions of both are available pending final inspections. The practical point stands, though. A Certificate of Completion rests on the premise that the floor plan did not change, and field deviations attack that premise directly.
Your permit stays alive through inspections, not through work
This framing is genuinely particular to Florida, and it catches people out. Under FBC 105.4.1, a permit becomes invalid if work is not commenced within 180 days of issuance, or if work is suspended or abandoned for 180 days.
Then 105.4.1.3 defines what keeps it alive:
Work shall be considered to be in active progress when the permit has received an approved inspection within 180 days.
So a busy site with no passed inspection for six months has an expiring permit, no matter how much work happened. Local governments may send a written expiration notice no less than 30 days before a permit expires under § 553.79(1)(c), but that is a courtesy rather than a guarantee.
As-Built Drawings in Florida: the Legislated Off-Ramp, and Its One Condition
Nevertheless, Florida has by far the most developed statutory scheme for stale permits. Under § 553.79:
- The statute defines “close” to mean that the requirements of the permit have been satisfied.
- An owner may retain the original contractor listed on the permit, or hire a different contractor, to close it.
- An owner may close an expired permit without having to obtain a new building permit where the requirements are substantially completed.
- A local enforcement agency may close a permit six years after issuance even without a final inspection, if it determines no apparent safety hazards exist.
- An arms-length purchaser is protected from denial, violation notices, fines and fees based solely on unclosed permits issued to a previous owner.
Above all, every one of those routes runs through the same gate, though. The requirements of the permit have to be satisfied. If the built condition does not match the permitted set, they are not satisfied, and none of the relief provisions reach you. That gap is where as-built drawings in Florida do their work.
The failure nobody expects: product approval
Here is a Florida-specific problem that measurement work in other states never encounters. Under § 553.842, statewide product approval covers panel walls, exterior doors, roofing, skylights, windows, shutters, impact protective systems and structural components.
The statute is blunt about marketing, too. A product may not be advertised or sold as hurricane, windstorm or impact protection from wind-borne debris unless it is approved under that section.
Now consider a substitution made in the field. Windows, doors, shutters or roofing installed to a different specification than the approved product schedule is a common final-inspection problem in Florida. Moreover, it is a documentation failure as much as a product failure, because the amended construction documents have to carry the correct approval numbers. Miami-Dade Notices of Acceptance work the same way.
Condominiums: milestone inspections raise the stakes
If the property is a condominium or cooperative three habitable stories or more in height, § 553.899 applies. A Phase One milestone inspection is due by December 31 of the year the building reaches 30 years of age, then every 10 years. Local agencies may require 25 years in coastal or environmentally sensitive areas.
Buildings under that regime already generate structural documentation on a schedule. Accurate drawings of the existing condition are therefore worth having for reasons well beyond a single permit closeout.
What our as-built drawings in Florida include
Send the permitted set as a PDF. We produce as-built drawings in Florida by measuring the property as built and reconciling the two.
- Wall positions dimensioned from fixed points, not scaled from the permitted sheet
- Door and window openings measured, with swings recorded as installed
- Ceiling heights room by room, including beams, bulkheads and soffits
- Plumbing fixtures, appliances and mechanical equipment located
- Every deviation red-lined onto your permitted set
- Updated layered AutoCAD DWG and PDF of the building as built
Your architect or engineer then submits the amended set that Section 107.4 requires, with the correct product approval references where openings changed.
Where we produce as-built drawings in Florida
We measure across Florida, including Miami, Fort Lauderdale, West Palm Beach, Orlando, Tampa and Sarasota. See our guide to existing conditions surveys in Florida for the underlying service. In short, the statute text comes from the Florida Senate.
Frequently Asked Questions
Does moving one wall really change which certificate I need?
It can. A Certificate of Completion applies to remodels that do not change the existing floor plan. Once the floor plan changes, that basis no longer describes the project, and the amended construction documents required by Section 107.4 become the route forward.
My permit is old. Can I still close it?
Often yes. Florida allows an owner to close an expired permit without pulling a new one where requirements are substantially completed. In addition, a local agency may close a permit six years after issuance without a final inspection if no apparent safety hazards exist. All of it depends on meeting the permit requirements in full.
What if the windows installed are not the ones on the approved schedule?
That needs documenting. Statewide product approval under § 553.842 covers windows, doors, shutters, roofing and impact protective systems, so the amended drawings need to carry the correct approval or Notice of Acceptance numbers for the products the installer actually used.
How quickly can you deliver as-built drawings in Florida?
We can usually be on site within the same week. Drawings start at 2 business days after the visit, with a 24-hour rush option available for an additional fee.